The BOM Procedure
Examples: BOM Procedure
- 3.1 Bill of Material with Single Input Data Set
- 3.2 Bill of Material with Lead Time Information
- 3.3 Bill of Material with Scrap Factor Information
- 3.4 Planning Bill of Material
- 3.5 Modular Bill of Material
- 3.6 Bill of Material with Repeated Relationships
- 3.7 Bill of Material Verification
- 3.8 Roll-Up Cost in Indented Bill of Material
- 3.9 Bill of Material Explosion
- 3.10 Aggregating Forecasts Using PROC BOM
- Statement and Option Cross-Reference Tables
This section contains examples that illustrate the features of the BOM procedure. Most of the examples use the data from the ABC Lamp Company product line described in the section Getting Started: BOM Procedure.
Copyright © SAS Institute Inc. All rights reserved.